Network service and connection fee rates for production 1 January 2026
On this page, you can see the current electricity production prices within Caruna’s distribution area.
For network service contracts of power generation facilities, we comply with the valid terms of network service recommended by Finnish Energy.
Network service rates for production in the distribution network, Caruna Oy and Caruna Espoo Oy
If the nominal output of the generator in the production plant is 1 MW or greater, we collect a consumption fee for self-generated and consumed electricity (for consumption other than the internal consumption of production). The internal consumption of production includes auxiliaries in power plants as provided for in the Decree of the Ministry of Economic Affairs and Employment of Finland (309/2003).
The customer takes care of the compensation of reactive power at the connection point whenever necessary.
Distribution fee for electricity generated
| Distribution fee for electricity generated €/MWh | VAT 0% | VAT 25.5% |
|---|---|---|
| Max. production power 100 kW | 0.00 | 0.00 |
| Production fee over 100 kW | 0.58 | 0.73 |
Consumption fee for self-generated electricity
| Consumption fee for self-generated electricity €/MWh | VAT 0% | VAT 25.5% |
|---|---|---|
| Consumption fee winter season (1 December - 28 February Mon-Fri 7 am - 9 pm) | 10.47 | 13.14 |
| Other times | 2.97 | 3.73 |
Connection fees for production
Connection contracts of power generation facilities comply with the valid terms and conditions for network connection (LE 2019) recommended by Finnish Energy.
The equipment must comply with technical and electrical safety regulations so that the production facility does not cause danger or undue disturbance to other electricity users. When operational, if the equipment does not comply with the regulations or causes danger to life, the owner of the production facility will be responsible for the damages caused by the equipment. The production equipment must be equipped with the appropriate safety devices to prevent any damage to the equipment in case of network interruption, and problems with safety or the standard of electricity.
If the production equipment causes network interruptions, the right to the parallel use of the equipment may be suspended until the facility operates within the permissible interruption limits.
Pricelist Caruna Espoo Oy
| Price (VAT 0%) | Price (VAT 25.5%) |
|---|---|
| Connection point | |
Substation Direct expansion costs + €8.5/kVA | Direct expansion costs + €10.67/kVA |
Connection along the line Direct expansion costs + €17.00/kVA | Direct expansion costs + €21.34/kVA |
Pricelist Caruna Oy
| Price (VAT 0%) | Price (VAT 25.5%) |
|---|---|
| Connection point | |
Substation Direct expansion costs + €8.5/kVA | Direct expansion costs + €10.67/kVA |
Connection along the line Direct expansion costs + 59.00 €/kVA | Direct expansion costs + 74.05 €/kVA |